dURACORR - HISTORY
1998-2000 |
||
|---|---|---|
- |
Aimed to provide the Canadian Oil Sands with a pipe product that would handle the synergistic problem of erosion and corrosion |
|
»Option 1: alloy 625 clad pipe → end user claimed too expensive |
||
- |
First Duracorr Pipe |
|
» A 10ft plate was formed on a press brake and hand stick welded at 4” per minute to produce a 24” x .375” min wall Duracorr pipe for a Syncrude test program → proved successful |
||
- |
Gandytec's original objective → to economically produce long lengths of large OD ERW Duracorr pipe on a cage forming mill at 53ft per min from coil |
|
2003 |
||
- |
700 feet of 24” x .375” x 51ft Duracorr pipe was formed and welded by ERW successfully at 53 feet per minute |
|
» Installed in course tailings pipelines → remains in service |
||
2005 |
||
- |
150 feet of 26” x .500” DSAW Duracorr pipe produced |
|
» Installed in course tailings pipelines → wear results unknown |
||
2006 |
||
- |
Created the Duracorr pipe specification: ASTM A-1053 Standard Specification for Welded Ferritic-Martensitic Stainless Steel Pipe |
|
- |
6,000 feet 24” x .410” min wall x 51ft Duracorr pipe was ERW welded at 53 ft per minute |
|
» Production from coils was eliminated due to coil heat treat results = Currently manufactured from discreet plates only |
||
» ERW proved to be marginal as substantial weld repair was required |
||
» Pipe remains in course tailings line service |
||
2009-2010 |
||
- |
11,000 feet 24” x .410” min x 51 ft Duracorr pipe was welded by ERW/SAW |
|
- |
5,000 feet 28” x .410” min x 40 ft Duracorr pipe welded by DSAW |
|
2010 |
||
- |
Standardized DSAW as the weld method for producing Duracorr to provide a more reliable weld with production speeds up to 48 inches per minute and in lengths up to 51 ft |
|
- |
Qty 6, 28” and 30” OD x .750” wall RFSO Duracorr pipe spools were fabricated for the MARIOS field test program. Two, 10 foot pipe spools are to be field tested in Syncrude, Suncor and CNRL tailings lines |
|
- |
Participated and became a member of MARIOS (materials and reliability in Oil Sands) program. |
|
2011 |
||
- |
26” x .750” x 80 foot flanged Duracorr pipe spools were fabricated and delivered to an Oil Sands site for use in hydro-transport and tailings pipelines |
|
- |
475 feet 10”, 14”, 18” XH Duracorr pipe manufactured |
|
Currently |
||
- |
Developing DSAW welding speeds up to 100 inches per minute |
|
- |
Working to incorporate Duracorr as a listed material in ASME B31.3 and B31.11 |
|
- |
Developing Duracorr pipe fittings |
|